Changes between Version 15 and Version 16 of InterpretingFeedback


Ignore:
Timestamp:
02/19/14 15:36:35 (6 years ago)
Author:
welberge
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • InterpretingFeedback

    v15 v16  
    1414 
    1515== Feedback obtained from a single BML block, in order == 
    16  1. Block prediction feedback before scheduling, takes into account composition/appendAfter attributes, provides block start prediction. 
    17  1. Block and behavior prediction feedback after scheduling, provides block start and end time prediction, internal timing of behaviors in the block. 
    18  1.  
     16 1. Before scheduling: predictionFeedback for block, takes into account composition/appendAfter attributes, provides block start prediction. 
     17 1. After scheduling: predictionFeedback for block+behaviors  provides block start and end time prediction, internal timing of behaviors in the block, timing based on e.g. rest posture. 
     18 1. At block start: blockProgress, block start feedback 
     19 1. Directly after block start: predictionFeedback for block+behaviors, provides block start and end time prediction, internal timing of behaviors in the block, timing based on e.g. start posture. 
     20 1. During execution:  
     21    a. syncPointProgress feedback for syncpoints of all behaviors in the block 
     22    b. predictionFeedback whenever timing predictions change (e.g. through anticipator time changes, bottom-up adaptations, parametervaluechanges that affect timing) 
     23 1. At end: blockProgress, block end feedback